Hundred of Hoo Academy
New building, built using a steel frame system has been delivered within the grounds of the Hundred of Hoo Academy.
  • Client: Leigh Academies Trust
  • Project Type: New Build

About this Project

The new building, built using a steel frame system has been delivered within the grounds of the Hundred of Hoo Academy, in Hoo St Werburgh and is located to the west of the existing secondary school in the same location.

Works carried out

  • Steel framing system
  • Suspended ceiling s
  • Acoustic Rafts
  • Plasterboard Partitions

Related Projects

Folkestone College

A new teaching block and campus reception building

Bennett Memorial Diocesan School

A new 2 storey teaching block to provide a range of general and ICT teaching spaces

The Sittingbourne School

A new 3 storey teaching classroom block and a 2 storey extension